Glossary
Glossary
The words you see on screen, in plain English. CD and ID here mean drawing packages, not login IDs. Status is not the same as stage. People say request for three different things — each has its own entry. Jump to a term below (103 of them).
Jump to a topic
- On screen (12)
- Dates and milestones (17)
- Capacity and demand (18)
- Requests and hours (7)
- People and teams (8)
- Catalog, codes, and templates (8)
- Planning tools (9)
- Status and stage (6)
- Integrations and API (13)
- Scores and reports (5)
On screen
Capacity grid
The staffing heatmap: people or teams down the side, time periods across the top, hours in the cells. Filters and demand layers change what the cells include.
See also: Demand vs Capacity, Demand layers, Utilization.
Command palette
The keyboard jump box for going to a page or action without hunting the sidebar. Open it from Help → Keyboard shortcuts.
Dashboard
The home view after sign-in. Counts and shortcuts into My Work, capacity, and projects.
Fleet
The catalog of bookable assets: vehicles, trailers, cart sets, kits, freight lanes, tools. There is no Fleet row in the main sidebar. Open it with Open Fleet from the Logistics empty state, or search Equipment in the command palette. The heading on that screen is Equipment. Photos and dated notes live on Edit Equipment.
See also: Logistics Schedule, Equipment, Samsara.
Ground Control
The Settings area of Flightplan. Org options, catalog, integrations, notifications, and similar controls live here — not on Work Plan or Timeline.
See also: Task catalog, API key.
HQ
The Flightplan employee desk at /hq. Signed-in Flightplan staff merch, warehouse, and fulfill Cards & Kits from there — not from a client Admin tab. History mixes order events with host rows (staff grant/revoke, pointer set/clear/miss, UID paste, vendor receive) and does not use a tenant id. Buyers still order at /shop and in Ground Control. HQ is not Ground Control and not a tenant Admin page.
See also: Ground Control.
Logistics Schedule
The Time & Availability tab next to Install Schedule. Rows are Fleet assets. Columns are days. Bookings are chips. The window starts at Next 4 weeks. Request asset, Today, and the group filter live on this toolbar. Seed, import, and Samsara sync do not. Those are Ground Control.
See also: Fleet, Asset request, Ground Control.
My Work
Your page after sign-in: tasks, schedule, and time off. When travel itineraries are on, trip cards show your flights, stay, contacts, and maps. The calendar subscription is dated shifts. Flights and stays are not on that feed yet. My Work is not the Capacity grid and not the team Work Plan.
See also: Work Plan, Time off.
Overview
The first tab on a project. Target Start, First Use, and Target End sit in the cards. The Milestones list is under those cards.
See also: Milestone, First Use, Target Start.
Portfolio
The cross-project view: which jobs are on track, tight, or at risk, without opening each one.
Timeline
The Timeline view of a project: tasks as bars across dates. In the app the tab is labeled Timeline, not Gantt. Work Plan is the same task list in a spreadsheet layout. A milestone type (CD start, install trip, and so on) is set on the task itself, so it shows in both views.
See also: Work Plan, Task type, Phase.
Work Plan
The spreadsheet view of a project's tasks: dates, people, and hours. This is where assignments are copied, pasted, and cleared. Hrs (sch/est) is the hours column. The same tasks also appear on Timeline as bars. The tab is labeled Work Plan (two words), not Workplan.
See also: Timeline, Target Start, Actual Start, Hrs (sch/est), Asset request.
Dates and milestones
Actual Start (Act Start)
The window implied by real scheduled people on the Work Plan. Team requests with nobody named do not set Actual Start or Actual End.
See also: Target Start, Allocated.
Assembly start
When shop assembly begins. Set a task's type to Assembly start. It is not the same as an install trip.
See also: Install trip, Report tag.
CD due
When Construction Documentation is due. By default this is the end of the CD-start task. You only mark a dedicated CD-due task if that due date is different from the CD task end.
Systems that read Flightplan dates use this end. They do not guess from the task title.
See also: Construction Documentation, CD start, ID due.
CD start
The start of the Construction Documentation task. On Work Plan or Timeline, set that task's type to CD start. Renaming the task does not make it CD start.
See also: Construction Documentation, CD due, Task type.
Civil date
A calendar day with no time zone attached: YYYY-MM-DD or empty. External systems that read Flightplan dates should use this, not a timestamp and not a guess from a task title.
See also: CD due, Public API.
Construction Documentation (CD)
Construction Documentation — the drawing and specification set the field builds from. In Flightplan, CD is a type you set on a task, not a phrase in the task title. That task shows on Work Plan and on Timeline.
One CD task carries two dates: start and end. The start is CD start. The end is CD due unless a separate CD-due task is marked.
See also: CD start, CD due, Task type.
Contract
The contract-signing milestone on Overview. Set a task's type to Contract. The date is that task's date, not a guess from the title.
See also: Milestone, Task type.
Extra date
A freeform date you add on Overview for anything that is not a built-in milestone: a delivery, a penalty date, a walkthrough. Name it, pick a calendar day, remove it when it no longer belongs.
Extras sort with the marked milestones, earliest first. Rows with no date sit at the bottom.
See also: Milestone, Overview.
Final invoice
The last-invoice milestone on Overview. Set a task's type to Final invoice.
See also: Milestone.
First Use
The date the client first uses the room or system. It stays on the Overview card. If a task is marked First Use, that date wins; otherwise the project First Use field is used.
See also: Overview, Milestone.
ID due
When Installation Documentation is due: the end of the IDs task. Set that task's type to ID due on Work Plan or Timeline.
See also: Installation Documentation, CD due.
Install trip
A site visit to install. These are repeating tasks, counted by date. They are not on the Overview milestone list.
Peers on the same day for the same team or person count as one trip. You can also mark a catalog SKU as an install trip so new tasks from that SKU count without a separate click.
See also: Task catalog, SKU, Split Evenly.
Installation Documentation (ID)
Installation Documentation — the package the install team uses on site. In Flightplan this is a task type. It is not a user id, a login, or a database key.
ID due is the end of that IDs task. Reviews and surveys are not ID due.
Milestone
A date Flightplan treats as a named checkpoint: CD start, CD due, ID due, Contract, Assembly start, Final invoice, plus extras you add. The type on the task is the identity, not the task title.
See also: CD due, ID due, Extra date, Task type.
Parent date rollup
A parent task's Tgt Start and Tgt End are the earliest start and latest end of its children. Edit the kids, not the parent — the parent row is locked. Deleting a child recomputes the parent from who is left.
See also: Target Start, Work Plan.
Target Start (Tgt Start)
The planned window for the project or task. Target Start and Target End live on the Overview cards. They are the plan, not the hours actually booked. On Work Plan, a parent task's Tgt Start and Tgt End follow its children; the parent row is locked.
See also: Actual Start, Overview, Parent date rollup.
Task type
The type on a task that tells Flightplan what it is: CD start, ID due, install trip, and so on. Set it on the task in Work Plan or Timeline. Renaming the task does not change the type.
Catalog SKUs can carry a default type for new tasks. Live tasks still use the type on the task itself.
See also: Milestone, Install trip, SKU.
Capacity and demand
Allocated
Hours on a named person. Allocated TO a person is different from requested FOR a person. Putting a name on the wrong field moves hours out of the unassigned pool.
See also: Staff request, Team pool, Tentative, Cover.
Allocation %
How much of one person belongs to each team they sit on. 50/50 splits their available hours across those teams.
See also: Team, Availability.
Availability
When a person can work: working days, hours, and approved time off. Capacity uses this as the denominator for utilization.
See also: Time off, Rotation schedule, Utilization.
Cover
This booking covers that request. Once covered, the link stays across syncs so the hours are not asked for twice.
See also: Allocated, Staff request.
Defer
An org-wide decision that this work is not in the live plan right now. Everyone sees it. The toolbar can show Hidden, Included, or Only deferred.
Deferment impact analysis estimates what happens if that work comes back.
See also: Hide, Pull-forward.
Demand layers
The Capacity toolbar Demand control, left to right: Allocated (named-person bookings only), +Staff (plus requests for a named person), +Team (plus the team pool — this matches Planview DvC), +Unscheduled (plus planned team work that was never scheduled). +Unscheduled is Flightplan-only and is the default.
See also: Allocated, Team pool, Staff request, Unscheduled.
Demand vs Capacity (DvC)
The view that stacks work asked of a team or person (demand) against the hours they actually have (capacity). Over 100% is over-allocated.
See also: Demand layers, Utilization, Capacity grid.
Hide
A personal filter on the Capacity grid. Instant, local, only for you. It is not Defer.
See also: Defer.
Needs Scheduling
The amber list on My Work: tasks you are assigned to on the Work Plan but have not booked hours for yet.
See also: My Work, Work Plan, Allocated.
Primary team
The star on a team-membership row. Clicking it sets this team to 100% of the person and every other membership to 0%. It is a shortcut for Allocation %.
See also: Allocation %, Team.
Pull-forward
Candidates to bring deferred or later work earlier, scored by location and remaining capacity so a crew is not sent across the country for a half day.
See also: Defer.
Rotation schedule
A repeating on/off pattern for a person or team, such as two weeks on and one week off. Capacity treats off weeks as unavailable. The Anchor date is the Monday that starts week 1 of the cycle.
See also: Availability, Primary team.
Spread vs Merged
Some planning systems send pooled hours as one lump on a capacity grid — often sitting on the first of the month. Merged leaves that lump where it landed. Spread redistributes those hours across the workdays in the month.
Merged is what everyone sees unless the choice has been switched on for your organization, and it only makes a difference where an import put a whole month of pooled hours on a single date. An owner or admin can turn the button on under Settings, Organization, General Settings.
See also: Team pool, Demand vs Capacity.
Team pool
Hours asked of a team with nobody named. This is unassigned team-level demand. It is not the Requests inbox.
See also: Staff request, Demand layers, Allocated.
Tentative
A soft booking. It counts in some views and stays obvious that it is not a firm allocation.
See also: Allocated.
Unassigned queue
The Queue button next to DvC on the Capacity toolbar. It lists team-requested hours that still need a named person. That is different from +Unscheduled, which is planned work that never got dates.
See also: Team pool, Demand vs Capacity, Unscheduled.
Unscheduled
Planned team work that was never given dates or a person. The +Unscheduled demand layer includes it. Planview DvC does not.
See also: Demand layers, Team pool, Unassigned queue.
Utilization
Allocated hours divided by available hours for a person or team in a period. Over 100% means the cell is over-allocated.
See also: Demand vs Capacity, Availability.
Requests and hours
Asset request
A project ask for a Fleet asset. Open Request asset from a task or phase sidebar, or right-click on Work Plan. Start and end come from that row. Submitting does not jump project and does not create a Work Plan leaf. Logistics coordinators press Schedule (pick a real asset, which books it and adds a Logistics · … leaf) or Deny (a reason is required). Owners, admins, and managers can fulfill. A member needs the Logistics coordinators grant in Ground Control.
See also: Logistics Schedule, Logistics coordinator, Fleet, Work Plan.
Estimate
The hours the task is thought to need (the EST cell on a Work Plan row). Saving EST on a leaf scales unbooked team requests in proportion and keeps the current split. A person already booked on the task is left alone. Parent Hrs still add the children.
See also: Allocated, Team pool, Labor estimate, Hrs (sch/est).
Hrs (sch/est)
The Work Plan hours column: scheduled hours over the task estimate. Requested team hours (nobody booked yet) show in italic. Hover or click the header to open the stored labor estimate card. Shift-click still sorts. Click WBS to return to outline order.
See also: Labor estimate, Estimate, WBS.
Labor estimate
The stored sold-order hours, crew, and days by team for a job. On Work Plan, hover or click Hrs (sch/est) — or the clipboard icon in the header — to open a compact card. Each team is one row. The header highlights when Work Plan EST is 10% over or under. A checkup sends one Slack notice for the jobs that just crossed that line, not one message per job and not on every page load.
See also: Hrs (sch/est), Estimate, Work Plan.
Resource request
A formal ask in the Requests inbox for extra hours from a team or person, often across teams. Statuses: Pending → Approved / Denied / Cancelled / Expired. This is not a team-pool row on the Work Plan.
See also: Staff request, Team pool, Asset request.
Staff request
Hours asked for a named person who is not yet booked. The person is requested, not allocated. This is not the Requests inbox.
See also: Team pool, Allocated, Resource request.
Time off
My Work → Time Off. Benefit types: PTO, Sick, Holiday, Training, Unpaid. Only Approved time off fills the Capacity overlay.
See also: Availability, My Work.
People and teams
Deactivate
Turn a resource off without deleting history. They stop showing as bookable. Removing someone from a team is different: they leave that team and can still exist on others.
See also: Resource.
Department
A grouping of teams for filters and reports. It is not itself a team you assign hours to.
See also: Team.
Logistics coordinator
A member listed under Ground Control → Logistics coordinators. They receive asset requests and can Schedule or Deny them on Logistics. Owners, admins, and managers already have that ability without the extra grant.
See also: Asset request, Logistics Schedule, Ground Control.
Multi-team task
A task that more than one team works. Hours can be split across those teams. Split Evenly divides the estimate; you can still type over it.
See also: Split Evenly, Team.
Resource
A person (or, less often, a named asset) you can book. Resources sit on teams, have skills, and have availability. Bookable trucks and kits live on Fleet, not on the people list.
See also: Team, Skill, Deactivate, Fleet.
Skill
A capability on a person, used when matching work to who can do it.
See also: Resource.
Split Evenly
Divide a task estimate evenly across the teams on the row. Install trips and multi-team tasks both use this.
See also: Multi-team task, Install trip, Estimate.
Team
A group you staff as a unit. Tasks can ask hours of a team before anyone is named. That leftover is the team pool.
See also: Team pool, Department, Multi-team task.
Catalog, codes, and templates
Benchmark
Typical hours for a job code, used when comparing a live task to what that kind of work usually takes.
CCNN
The numbering shape of a job code. CC (first two digits) is the category of work. NN (last two digits) is the specific task type in that category. Example: 1701 is Installation in category 17.
See also: SKU, Task catalog.
Phase
A grouping of tasks inside a project (design, install, closeout, and so on). Phases are rows in the tree, not project status.
See also: WBS, Project status.
Project template
A reusable task tree. New projects can start blank or from a template. Tasks on the template that already have a team become team demand on the new job.
See also: WBS, Archive import.
Report tag
A label on a catalog SKU for operator reports: drawings, assembly, commissioning, office work, paperwork, certification, design. Tags are not the same as the task type used for milestone dates.
SKU
In Flightplan, a SKU is a catalog job code for a kind of work. Tasks created from a SKU copy its defaults.
Marking a SKU as an install trip means new tasks from that SKU count as trips without a separate “Add Install Trip” click.
See also: Task catalog, Install trip, WBS, Benchmark, CCNN.
Task catalog
The library of SKUs (job codes) used to create tasks. A SKU can default an install-trip flag, report tags, and estimates for new rows.
See also: SKU, Report tag, Project template.
WBS
Work breakdown structure: the task tree. Creating a project from a template copies that tree. Tasks that already have a team become team demand on the new job.
See also: Project template, Phase.
Planning tools
Allocation meeting
A working session on the Capacity grid for a group to propose staffing changes together, then commit or discard them.
See also: Capacity grid.
Blueprint
A floor plan or site drawing attached to a project. Pins on the drawing hold photos and notes for a location.
See also: Pin.
Budget
The hours or money the project is allowed. Tracking compares booked and logged time against that cap.
See also: Timesheet, Estimate.
Conflict detection
Flags when the same person is booked twice, a task is outside its window, or hours do not fit remaining capacity.
See also: Allocated, Capacity grid.
Equipment
A Fleet asset (truck, trailer, cart set, kit, freight lane, tool) or, on a job, tracked kit such as displays and crates. Equipment is not a person and does not have utilization the way a resource does. The heading on Fleet is Equipment. Bookings live on Logistics Schedule.
See also: Fleet, Logistics Schedule, Resource.
Pin
A marker on a blueprint. Photos and notes hang off the pin so field context stays on the drawing, not in a separate album.
See also: Blueprint.
Rework
Hours spent doing the work again. Rework tracking attributes those hours so they do not silently inflate the original estimate.
See also: Estimate.
Risk
A named threat to the job (late drawings, missing people, a hard First Use). Risks are tracked on the project, separate from Capacity red cells.
See also: First Use.
Scenario
A sandbox plan: Draft → Active → Applied → Archived. Applied writes the scenario's allocations onto the live jobs. Until then it does not change the real schedule.
See also: Allocated.
Status and stage
Client portal
A limited view for the client. A portal group uses Open (the link is enough), Password, or Email code. Matching several groups gives the union of modules.
Priority
Projects and tasks: Low / Medium / High / Critical. Resource requests use Low / Normal / High / Urgent — do not mix Medium with Normal.
See also: Resource request.
Project stage
Where the job is in the delivery lifecycle. Defaults: Initiation, Planning (design / pre-install), Execution, Monitoring (punch / warranty), Closing. Stage is not status.
See also: Project status, Phase.
Project status
Whether the job is live. Defaults: Draft (exists, not on the live plan), Planned (sold or accepted, not yet in motion), Active (live job you staff against), On Hold, Completed, Cancelled.
On Work Plan, the top-row status menu opens on the current status, so you can return a job to Draft after it was Active.
Your org can rename these in Settings → field options. Planning as a status is not the same as Planning as a stage, and not the same as Planned.
See also: Project stage, Task status.
Task status
Work Plan badges on a task: Pending, Active, In Review, Ready, Completed, Blocked. Project Active is not task Active.
See also: Project status, Work Plan.
Timesheet
Logged time against tasks. Statuses: Draft → Submitted → Approved / Rejected. Approved time is what utilization and budgets treat as spent.
See also: Budget, Utilization.
Integrations and API
Apex
The durable job number other systems know the project by. Once set, Flightplan will not overwrite it. Public API identity uses this code.
See also: Public API, Planview.
API key
A secret for the public API or MCP. Create and revoke keys in Ground Control. Treat them like passwords.
See also: Public API, MCP, HMAC.
Archive import
Copy a job from an archive organization. Blank copies metadata only. Structure copies the task tree with no team stamp and no hours, so hours on the template cannot invent demand on the new job.
See also: Project template, Team pool.
Calendar sync
Pushing bookings or time off to an external calendar so people see their Flightplan days next to everything else.
See also: Availability, Time off.
ClickUp
A task tracker some teams sync with Flightplan. ClickUp is not the Work Plan; the sync copies a subset of tasks and status.
See also: Work Plan.
HMAC
A signature on a webhook so the receiver knows the payload was not altered. Flightplan signs outbound webhooks. Inbound Samsara events are checked the same way before they are stored.
MCP
Model Context Protocol. A way for an AI assistant to call Flightplan tools — look up jobs, put people on the Work Plan, slide dates, and so on. Slack @Flightplan uses your org role and does not need a key. Claude Desktop, Cursor, and similar clients use an MCP API key from Ground Control.
See also: API key, Slack AI assistant.
Microsoft Planner
Microsoft 365 Planner. A possible sync target for a lightweight task list. It is not the Flightplan Work Plan.
See also: Work Plan.
Planview
The scheduling system some orgs still sync with (also known as Clarizen). Flightplan can pull and reconcile against it. Planview DvC matches the +Team demand layer, not +Unscheduled.
See also: Demand layers, Demand vs Capacity, Apex.
Public API
The documented HTTP API for external systems (api.flpl.ai). Dates on that feed are civil calendar days. Designated milestones, install trips, and extra dates are separate lists. Monthly capacity matches the +Unscheduled layer; a sibling path can drop Trip Rest and Truck Pack beyond a day window.
See also: Civil date, API key, Webhook, Apex, Demand layers.
Samsara
Optional fleet GPS. Connect a per-organization API token in Ground Control → Integrations → Fleet tracking. Sync locations & details matches Samsara names to Fleet rows. There is no manual picker. Webhooks post to the HTTPS URL shown on that card and are HMAC-verified. Geofence enter/exit is what Logistics uses first. Samsara installer photos often return HTTP 403; upload a Fleet photo yourself. Import Fleet from Samsara and the starter-catalog seed are org-admin only, on Logistics setup, not on the schedule toolbar.
See also: Fleet, Logistics Schedule, Webhook, HMAC, Ground Control.
Slack AI assistant
The Slack bot that looks up jobs, puts people on the Work Plan, slides dates, and ranks who is free. In a channel, tag @Flightplan. If it asks a question, reply in the same thread and tag @Flightplan again. It does not read every channel message. Direct messages do not need the tag. It uses your Flightplan org role. It can copy a workplan in one step (preview, then confirm): overlay an existing dest and create missing dest rows from the source, or create a new dest job as a copy of the source. Some Slack and MCP features may incur consumption charges. Speak with your account manager for details.
See also: MCP.
Webhook
An HTTP callback. Flightplan can send one when something changes, and can receive one (Samsara geofence and vehicle events). Verify payloads with HMAC and the shared secret.
See also: HMAC, Samsara, Public API.
Scores and reports
Built-in reports
Operator reports that ship with Flightplan (utilization, job-code hours, and similar). Catalog report tags feed some of these.
See also: Report tag, Utilization.
Efficiency ratio
Logged or predicted hours compared with the estimate or benchmark for that kind of work. Used on the Intelligence dashboard.
See also: Quality score, Benchmark, Predicted hours.
Predicted hours
What Intelligence thinks a task or job will actually take, given similar work. It is a forecast, not a booking.
See also: Efficiency ratio, Estimate.
Quality score
A 0–100 figure for how clean a plan is (missing dates, unassigned demand, over-allocation). It is not a grade on the people.
See also: Efficiency ratio, Utilization.
Workforce Intelligence
The analytics layer: efficiency matrix, predicted hours, quality. When data is thin, those numbers stay qualified rather than looking exact.
See also: Predicted hours, Efficiency ratio, Quality score.