What's new in Flightplan
What's new in Flightplan
This page is the longer story behind the in-app changelog. The changelog stays a short punch list. When a release ships, we update this article.
Last updated: 7 October 2026.
Start here: Logistics and My Work travel. That intro covers Fleet, asset requests, trip cards, flight tracking, contacts, and maps. The in-app announcement bar links there.
Public API: monthly capacity without far-horizon rest days
Integrations that already call monthly demand vs capacity can use a sibling path that keeps Trip Rest and Truck Pack in the near window, then drops them for later months. Near months still match the live monthly feed. Far months subtract rest and pack on Install Techs and Foremen only.
Default cutoff is 60 days from today. You can pass a different day count. The original monthly path is unchanged.
Full notes and a curl example: Public API for external systems. Live schema: api.flpl.ai/v1/docs.
Logistics, Fleet, and asset requests
Keep trucks, trailers, cart sets, and kits in Fleet. On that screen the heading is Equipment.
Book them on Time & Availability → Logistics, next to Install Schedule. Bookings are colored chips over Next 4 weeks or a calendar month.
From a Work Plan task or phase, press Request asset (sidebar chip or right-click). Dates come from that row. A pending ask is not a Work Plan leaf yet. Schedule creates a Logistics · … row. Deny does not.
Org admins seed, import, and connect Samsara in Ground Control — not on the Logistics toolbar.
Full notes: Logistics overview, Fleet catalog, Logistics Schedule, Asset requests, Samsara.
Travel itineraries
Each project can keep travel on the Itinerary tab. One trip per install mobilization: flights, stays, cars, equipment, contacts, and private confirmation files.
Paste a confirmation email, PDF, or photo to fill in bookings. Or paste rows from a travel spreadsheet. Flight numbers look up airports and times. Booked flights are checked about 12 hours and about 1 hour before departure.
Crew see their own flights, stay, and car on My Work. Door and lockbox codes show only to the people in that room, from 24 hours before check-in. Travel coordinators and travel costs are granted in Settings > Organization > Travel. The feature is turned on per organization by Flightplan staff.
Full notes: Travel itineraries.
Who can change team member details
Only the person themself, a manager or an admin can change a team member’s details. On your own record you can still update phone, home airport, home base, time zone and photo. Job title and department stay with managers and admins (job title decides who is foreman on a trip). Pay, capacity, email and skills stay manager-only as well.
Full notes: Who can change team member details.
Labor estimate on Work Plan
A job can carry a stored labor estimate: hours, crew, and days by team. That table is the sold-order receipt. It is not the same as the EST cell on a task row.
On Work Plan, hover or click Hrs (sch/est) to open a compact card. The same card opens from the clipboard icon in the Work Plan header. Each team is one row (crew, days, estimate, Work Plan, delta). The list fits without an inner scrollbar.
The header and clipboard icon highlight when Work Plan EST is 10% over or under the stored estimate. A checkup sends one Slack notice for the jobs that just crossed that line, not one message per job. Opening the Work Plan does not send the notice again.
Shift-click Hrs (sch/est) still sorts. Click WBS to return to outline order. If the job has no stored estimate, a plain click on Hrs sorts as before.
Full notes: Labor estimate on the Work Plan.
Parent task dates follow children
A parent task's Tgt Start and Tgt End are the earliest start and latest end of its children. Edit the kids, not the parent — the parent row is locked. Deleting a child recomputes the parent from who is left.
Slack can still fit stored parent and phase targets in one ask. You no longer need to type those dates on the Work Plan parent row.
Match requests to EST
Saving EST on a task cell scales unbooked team requests in proportion and keeps the current split. A person already booked on the task is left alone. Parent Hrs still add the children.
Match requests to EST on the Work Plan toolbar does the same for checked rows. A trip parent includes its children. Nothing checked asks whether to flow the whole project, then confirms again. Tasks with a person booked are skipped.
Hrs shows requested team hours in italic when nobody is booked yet — the same number as the assignment panel.
Engineering hours on ID and External CD children
Creating from a template now lands Engineering hours on ID children and External CD Review / Approval. Those rows used to inherit the Engineering team chip with 0h requested. Rebuild from the template to pick it up on existing jobs.
Work Plan project status can return to Draft
The top-row status menu opens on the current status. After a job is Active, you can set it back to Draft. Clicking Draft actually saves.
HQ for Flightplan employees
Flightplan employees open /hq for Cards & Kits: products, warehouse, sales, history, links, vendors, and settings. The client Admin merch tab is gone. Buyers still order at /shop and in Ground Control.
Org manuals and files live under More views → Library. Search, drop a PDF, or add an https link. Manual tags are free. Optional AI classify is billed like other AI calls. A job tag can point at a library item from the project Portal tab.
A delivered job tag can open a project file, doc, location, or an https page. People with tags:route set that pointer from the project Portal tab or from Change where this tag goes after they tap. The picker lists files, docs, locations, and library items on that page.
If the destination is gone, the tap still opens the project portal. It does not error. If the portal asks for a PIN, unlock still keeps that file, doc, location, or library document. A location id is not treated as the PIN.
HQ History lists those pointer set/clear/miss rows with staff grant/revoke, UID paste, and vendor receive. Those host rows do not use a tenant id.
Full notes: Job tags.
New tap cards encode https://flpl.ai/t/… — the same URL printed on Cards & Kits. The Ground Control Tap Cards writer uses that host. Already-printed chips are not rewritten.
Qty 25 / 50 / 100 bulk Prices stay off the catalog until a TEST Price id is attached. Until then, 25+ uses the attached unit TEST Price. Do not treat HQ as Ground Control.
Slack AI assistant
Tag @Flightplan in Slack to staff a job, slide dates (including phase target bars), fit parent and phase dates to their children, copy a workplan (preview, then confirm), or ask who is free for install.
In a channel, reply in the same thread and tag @Flightplan again. Your Flightplan role is what it uses.
A workplan copy overlays an existing dest and creates missing dest rows from the source. If the dest job does not exist, it creates that job as a copy of the source (not from a template). If someone else is editing those same rows, it stops and names them. If a request goes silent after tools finish, it will not ask you to retry the same change.
Some Slack and MCP features may incur consumption charges. Speak with your account manager for details.
Full notes: Slack AI assistant. IDE setup (API keys): MCP Integration Guide.
Milestone dates on the project panel
Open a project and stay on Overview. Target Start, First Use, and Target End stay in the cards at the top. Actual Start and Actual End appear when the job has real scheduled time. Under that is a Milestones list.
What the list always shows
These rows are always on Overview, even if the date is blank:
- CD start — start of the Construction Documentation task
- CD due — end of that same CD task, unless a separate CD-due row is marked
- ID start — start of the Installation Documentation task
- ID due — end of that same IDs task
- Contract
- Assembly start — start of the Assembly task
- Assembly due — end of that same Assembly task
- Final invoice
If a date is blank, set that task's type on Work Plan or Timeline. Renaming a task does not make it a milestone. The type is the identity.
How CD due and ID due work
CD due is not a second task you have to invent. One CD task carries two dates: start and end. The end is CD due. External systems that read Flightplan dates use that end. You only mark a dedicated CD-due row if you truly need a different due date than the CD task end.
ID due is the end of the IDs task. ID start is that same task's start. Reviews and surveys are not ID due.
Assembly due is the end of the Assembly task. Same idea as CD: one task, two dates.
First Use stays on the card at the top. If a task is marked First Use, that date wins. Otherwise the project First Use field is used.
Install trips are not on this list. They are repeating tasks, counted by date, and show on Work Plan and Timeline.
Extra dates you add yourself
Use + Add date for anything else — equipment delivery, a penalty date, a client walkthrough. Type a name, pick a calendar date, remove it when it no longer belongs. Extra dates sit with the marked ones. They sort with them.
The list is always earliest date first. Rows with no date sit at the bottom, so a new extra does not jump into the middle.
Adding or removing an extra updates the list in place. The project table behind the panel does not reload.
Install trips on catalog SKUs
In Ground Control → Task catalog you can mark a job code (SKU) as an install trip. Tasks created from that job code count as trips without a separate “Add Install Trip” click.
Peers on the same day for the same team or person count as one trip. Nested rows under an install parent also count as one.
Catalog report tags
A job code can carry more than one report tag. Tick the ones that match the work:
- Drawings (and construction / installation drawings)
- Assembly
- Shop commissioning / site commissioning
- Office work, paperwork, certification testing, design
These tags drive operator reports. They are not the same as the task type used for milestone dates.
Work Plan assignments
- Copy assignments and paste them onto other tasks
- Clear assignments from selected tasks, or remove one person from the menu
- Paste stays next to Copy and works on more than one task
- Tab goes start → end, then the assign picker if the task still has nobody
- A 0-hour assignment stays on the task instead of disappearing
Dates that leave Flightplan
Systems that poll Flightplan should read calendar dates (YYYY-MM-DD or empty), never guess from a task title.
- Designated types (CD start/due, ID start/due, contract, assembly start/due, first use, final invoice) are the tasks marked with those types
- Install trips are a separate list, numbered by date, each with a start and an end
- Extra dates from + Add date are a separate list of name + date. They are not folded into the designated types
CD due on that feed is the CD task end, unless a dedicated CD-due row exists.
What we did not change
- Target Start, First Use, and Target End still live in the Overview cards
- The in-app changelog is still the short release list (Help menu → Changelog)
- Buyer catalog, cart, and checkout still live at /shop and in Ground Control
- TEST Prices only. Null Price is not $0. NDEF on a chip is not rewritten